Newly Arrival Uneven Parallel Bars - Football soccer goal field steel metal frame soccer cage – LDK
Newly Arrival Uneven Parallel Bars - Football soccer goal field steel metal frame soccer cage – LDK Detail:
- Place of Origin:
-
Tianjin, China
- Brand Name:
-
LDK
- Model Number:
-
LDK20019
- Material:
-
High grade steel
- Competition:
-
FIFA world cup (世界杯)
- Product name:
-
Football soccer goal field steel metal frame soccer cage
- Certificate:
-
CE, NSCC, ISO9001,ISO14001,OHSAS
- Cage Size:
-
Tailor made
- Cage height:
-
1-6m or Customized
- Soccer goal material:
-
High grade steel tube
- OEM OR ODM:
-
Both we can
- Product lead time:
-
20-30 days
- Color:
-
As the photo or customized
- Warranty:
-
12 months
- Packing:
-
Safety 4 layer package: 2st EPE & 2nd Weaving Sack
- Combo Set Offered:
-
0
Football Soccer Goal Field Steel Metal Frame Soccer Cage
Product Name
|
Football Soccer Goal Field Steel Metal Frame Soccer Cage
|
Model NO.
|
LDK20019
|
Size
|
21x13m or customized
|
Height
|
1m or customized
|
Soccer Goal
|
Size: 1×1.5 m
Material: High grade aluminium tube |
Cage post
|
High grade steel tube
|
Structure
|
High grade durable steel structure
|
Fence Net
|
High grade durable PE or nylet net
|
Surface Treatment
|
Electrostatic epoxy powder painting, environmental protection, anti-fade,anticorrosion,anti-acid, anti-wet
|
Safety
|
We have a strict quality control system.All the material , structure, parts and products should pass all the test before mass production and shipment
|
OEM OR ODM
|
YES, all the details and design can be customized. We have professioanl design engineers with more than 39 years experience
|
Packing
|
Safety 4 layer package: 1st EPE & 2nd Weaving Sack & 3rd EPE & 4th Weaving Sack
|
Installation
|
1. All products are shipped knocked down
2. Easy, simple and fast
3. We can offer professional installation service if need and exclude in the cost |
Applications
|
All soccer equipment can be used for high grade professional competition, raining, sports center, gymnasium, community, parks,clubs, universities and schools etc.
|
products quality that our customers achieve in their competition.
Yes, all the staff in the department are with more than 5 years experience. Forall the OEM and ODM customers, we offer free design service if need.
(2)What is the after sale service please?
Reply within 24 hours, 12 months warranty, and service time up to 10 years.
(3)What is the lead time please?
Usually it is 7-10 days for samples, 20-30 days for mass production and this vary with seasons.
(4)Can you arrange the shipment for us please?
Yes, by sea, by air or by express, we have professional sales and shipment team to offer the best and prompt service.
(5)Could you print our logo please?
Yes, it is free if the order quantity is up to MOQ.
(6)What is your trade terms ?
Term of price: FOB, CIF, EXW. Term of payment: 30% deposit in advance, balance by T/T before shipment.
(7)What is the package?
LDK Safe Neutral 4 layer package, 2 layer EPE, 2 layer weaving sacks, or cartoon and wooden cartoon for special products.
Product detail pictures:
Related Product Guide:
The Expo we have attended,friendly communication about sports equipment.
We have been proud from the higher consumer gratification and wide acceptance due to our persistent pursuit of high quality both on product or service and service for Newly Arrival Uneven Parallel Bars - Football soccer goal field steel metal frame soccer cage – LDK , The product will supply to all over the world, such as: Bangladesh , Mombasa , Montpellier , Immediate and expert after-sale service supplied by our consultant group has happy our buyers. Comprehensive Info and parameters from the merchandise will probably be sent to you for any comprehensive acknowledge. Free samples may be delivered and company check out to our corporation. n Morocco for negotiation is constantly welcome. Hope to get inquiries type you and construct a long-term co-operation partnership.
(1)Do you have R&D department please?
Yes, all the staff in the department are with more than 5 years experience. For
all the OEM and ODM customers, we offer free design service if need.
(2)What is the after sale service please?
Reply within 24 hours, 12 months warranty, and service time up to 10 years.
(3)What is the lead time please?
Usually it is 7-10 days for samples, 20-30 days for mass production and this vary with seasons.
(4)Can you arrange the shipment for us please?
Yes, by sea, by air or by express, we have professional sales and shipment
team to offer the best and prompt service
(5)Could you print our logo please?
Yes, it is free if the order quantity is up to MOQ.
(6)What is your trade terms ?
Term of price: FOB, CIF, EXW. Term of payment: 30% deposit
in advance, balance by T/T before shipment
(7)What is the package?
LDK Safe Neutral 4 layer package, 2 layer EPE, 2 layer weaving sacks,
or cartoon and wooden cartoon for special products.
By Sahid Ruvalcaba from Tunisia - 2018.06.26 19:27
Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
By Jean Ascher from Cairo - 2017.10.23 10:29